KeptGuides

Repair estimates during your inspection period

Six ways to get a real number before your window closes, from a contractor's visit to a report-pricing service. Pick the one that fits your deadline.

Updated

How do you get real repair estimates before your window closes?

Six sources put a dollar figure on an inspection finding before your window closes: a contractor quote on site, a specialist inspection (sewer scope, structural engineer, heating, ventilation, and air conditioning (HVAC) tech), your inspector's own estimate add-on if they offer one, a report-pricing service that prices every line item on the report at once, a national cost guide, or your agent's read on comparable deals. You can run several at once. If you haven't sorted which findings need a number yet, start with what to ask for after a home inspection.

What are your options for repair estimates, and what does each cost?

Time and cost figures are labeled observed only where a named source states that exact figure for its own product. Where no independent source gives a national figure, the row lists what to ask when you call instead of a guess.

OptionWhat you getTime it takesWhat it costsWhat to ask when you callHolds up with a sellerBest used for
Contractor quote on siteA written bid for the specific repair, from a licensed contractor who saw the houseAsk when you callAsk when you callCan you come this week? Do you charge for the estimate? Will you put the scope and price in writing? Is the quote good for 30 days?Strong: a seller can call the contractor to check itOne big-ticket system: roof, foundation, HVAC, electrical panel
Specialist inspection (sewer scope, structural engineer, HVAC tech)A licensed specialist's own diagnosis and price for one systemAsk when you callAsk when you callCan you come this week? Do you charge for the visit itself? Will you put the finding and price in writing? Is the quote good for 30 days?Strong: it's the trade's own read on the trade's own systemA single flagged system the inspector could not fully test
Inspector's own estimate add-on, where offeredA cost report built from your own inspection, ordered from the company that wrote itWithin 24 hours, with a paid rush option in 6 hours in one observed example (observed, greenworksinspections.com)$125 standalone add-on price, free with some of the company's own inspection packages, plus $39 for the rush option in that same example (observed, greenworksinspections.com)Does your inspector's company offer this, and is the rush option available for your report?Moderate: may weigh less with some sellers since it comes from the company that found the issuePricing the full list fast, when your inspector's company offers this
Report-pricing serviceAn itemized cost for every finding on the report, from a separate pricing service, not your inspectorVaries by service. One example, Kept Inspect (usekept.com): usually under 4 hours (observed)Varies by service. One example, Kept: $79 per memo (observed)Order online, no call needed; ask what happens to findings marked as needing a professional quoteStrong for line items with a shown method; weak for lines marked needing a professional quotePricing everything on the report in one pass before you write your request
National cost guide (Angi, HomeGuide, Fixr, HomeAdvisor)A generic price range for a repair type, not tied to your specific house or metroNone: available anytime onlineFree to read; the range is national or metro-generic, not tied to your houseNo call: check the page's own date and whether the range is national or local before you use itWeak alone: it is a range, not a number tied to your houseA quick gut check on a range before you request a real quote
Asking your agentA rough range from someone who has seen comparable deals close nearbyMay be same day, by text or callFree, already part of their serviceHave you closed a deal recently with a similar repair? What did it cost then? Would you put your estimate in writing?Weakest: it is an opinion, not a documented estimateSmall items not worth paying for a quote, or a first gut check

A separate page compares the report-pricing services by name, including price and turnaround for each: inspection report repair estimate services compared. If you're a buyer's agent pricing several deals at once, see pricing inspection findings as a buyer's agent.

Kept's public sample memo, viewed 2026-09-19 on usekept.com, shows what one line item looks like once priced: extending three downspouts to discharge at least 4 feet from the foundation prices at $293 (modeled, usekept.com), shown with the labor, materials, trip, and markup that built the number.

Which findings can't a report-pricing memo price for you?

A report-pricing memo, Kept's included, prices line items with a formula: labor hours, materials, and the trade's own adders. Some findings get no formula price and are marked as needing a professional quote instead: foundation structural movement, a whole-house repipe, and regrading or drainage correction, plus similar large, condition-dependent scopes. For those specific lines, skip straight to the specialist inspection or contractor quote rows above. A formula cannot substitute for someone standing in the crawlspace or watching where water moves at the foundation. That is why those lines are marked for a professional quote instead of a modeled number.

Do home inspectors give repair estimates?

No, not as part of a standard inspection. InterNACHI's Standards of Practice list "correction, replacement or repair cost estimates" under the items an inspector is not required to determine (nachi.org/sop.htm, Section 2.2.I). Some individual inspection companies sell a repair estimate as a separate, priced add-on, which is the "inspector's own estimate add-on" row in the table above, but that is outside the inspection itself, not part of it.

What should you do with the days you have left?

These are actions to take with the time you have, not a statement of what your contract requires; your contract sets the actual date, so check that separately.

7 or more days left

Order a contractor quote or a specialist inspection now for every big-ticket system on the report (roof, foundation, sewer, HVAC, electrical panel). Booking today leaves room for a contractor who is slow to call back. Get a report-pricing memo the same day so every other line item already has a number while you wait on the bigger quotes. Save the national cost guide for the smallest findings only, since you have time to get quotes instead.

3 to 6 days left

Order a report-pricing memo first: it is the fastest way to put a number on the whole list at once. Reserve a contractor visit or specialist inspection for findings marked as needing a professional quote, since a memo cannot price those. Ask your agent for a same-day read on anything you are still deciding whether to include.

Under 3 days left

Get a report-pricing memo now. Of the options above, Kept's example shows a turnaround of hours, not days. Book a same-day contractor or specialist visit only if a finding is marked as needing a professional quote and the number would change what you ask for. For everything else, use your inspector's estimate add-on if it was offered, or a national cost guide range, to finish your list before you send it.

If you have days left in your window and want every line item on the report priced at once, get a Kept repair-cost memo: usually under 4 hours.

Sources

Cost figures are modeled from public wage and materials data unless a line says observed. Kept is accountable for the numbers on this page, and corrections go to support@usekept.com. How we price.