NWMLS Form 35 and 35R: pricing your inspection response
Under NWMLS Form 35, no notice by day 10 (the default) waives your inspection contingency. How Form 35R works and why each line needs a price.
Updated
How do you respond to a Washington inspection on Form 35R?
Send Form 35R before your Form 35 inspection period ends, 10 days by default, with a dollar figure on every item you ask for. Kept prices every line of an inspection report for $79, usually under 4 hours. If you send nothing in time, the contingency is deemed waived and the sale goes ahead as is. On 35R you approve, terminate, or ask for repairs or a lower price, and you get one request, one seller response and one reply.
Key takeaways
- Your notice is due by 9 p.m. on the last day of your inspection period. Miss it and the contingency is gone.
- Form 35R allows one round: your request, the seller's response, your reply. After that you agree in writing or terminate.
- Do not send the inspection report to the seller without written consent. Price each item and describe it in your own words.
How long is the Form 35 inspection period?
Form 35 is the Northwest Multiple Listing Service (NWMLS) Inspection Addendum. It makes your purchase subject to your satisfaction with the inspection. The parties write the number of days into the form, and the defaults below apply when a blank is left empty, per the Washington residential core course and Washington REALTORS.
| Step | Default if blank | Source |
|---|---|---|
| Your notice to the seller (Form 35R, Section I) | 10 days | Washington core course |
| Additional inspections, if your inspector recommends them | 5 days | Washington REALTORS |
| Seller's response (Section II) | 3 days after receiving your request | Washington core course |
| Your reply (Section III) | 3 days after receiving the seller's response | Washington core course |
Each deadline runs to 9 p.m. on its last day. Washington REALTORS gives the example that a buyer "must make the request by 9 p.m. on the final day of the contingency period." Your signed contract governs, and your numbers may differ from these defaults, so confirm every date with your agent.
What happens if you miss the Form 35 deadline?
The contingency is deemed waived. The core course says that if the buyer gives no notice in time, "the contingency is automatically waived, and the transaction continues without the seller being obligated to make any further modifications." The sale goes ahead, and you lose the right to ask for repairs or to terminate under this contingency. Send something on time, even if your list is short.
What can you do on Form 35R?
Form 35R, the Inspection Response, has three sections: your request, the seller's response, and your reply. In Section I you pick one of four actions:
- Approve the inspection and treat the contingency as satisfied.
- Disapprove it, terminate the agreement, and ask for your earnest money back.
- Give notice of additional inspections, within the deadline set on Form 35.
- Ask for specific repairs or modifications. The core course notes the most common modification is a reduced price.
Additional time only works if your inspector recommended further evaluation. Washington REALTORS says a buyer "may ONLY claim additional inspection time if buyer's inspector recommends further evaluation," and the seller can demand to see that recommendation. If a line needs a specialist, such as a sewer line or a foundation crack, ask your inspector to put the recommendation in writing.
How can the seller answer your 35R?
The seller has four choices in Section II, per the core course:
- Agree to everything. The contingency is satisfied and you head to closing.
- Agree to some of the repairs.
- Reject all of your requests.
- Reject them and propose a different repair or modification.
You then have three choices in Section III: accept the seller's response, reject it and terminate with your earnest money back, or reject it and propose one more alternative. The core course says "there is only one round of request, response, and reply." If you have no written agreement and have not terminated by your reply deadline, the contingency is deemed waived. If the seller says no, what to do when the seller refuses repairs covers your options.
Can you send the inspection report with your 35R?
Not without the seller's written consent. The NWMLS 2021 forms bulletin says that if the buyer gives the seller any portion of the report without prior written consent, the inspection contingency is deemed waived. The seller can ask for the report on Form 35 or on Form 35C.
So your 35R has to stand on its own. Describe each item in plain words and attach a dollar figure. The core course says the buyer's side should get a contractor bid and attach it, so "the parties can negotiate based on a realistic price." Ask your agent before you attach anything that quotes the report.
Why does every 35R item need a dollar number?
Because the seller only sees your words and your numbers, and you get one round. A line that says "repair roof" invites a no or a cheap patch. A line with a scope, a trade and a price gives the seller something specific to accept or counter. The core course expects the seller to push back with "a contractor's bid of their own," so your figure needs a method behind it.
| Line on your 35R | What the seller can do with it |
|---|---|
| "Fix the water heater" | Ignore it, or pick the cheapest fix |
| Replace water heater, add expansion tank, licensed plumber, receipt before closing, or a credit of your priced amount | Accept, reject, or counter a real number |
Use priced lines to decide between repairs, a credit and a price cut. Repairs vs. credit vs. price reduction covers that choice, and the buyer repair request letter template gives you wording for each line.
How do you get prices before the 35R is due?
A contractor bid is the strongest number, but most contractors can't visit and write a bid inside a 10-day window. The core course says it is "hard to get a contractor to come out in that short a period, let alone prepare a detailed bid." Price every line first, then spend contractor time on the few big items.
- List each item you plan to ask about, with the report page number for your own reference.
- Get a price on every line, built from labor, materials and the contractor's adders (how Kept prices).
- For lines that need eyes on site, such as foundation movement or drainage, use the additional inspection period if your inspector recommends it.
- Send the 35R a day early, so a delivery problem does not cost you the contingency.
More options are in how to get repair estimates during the inspection period. Agents pricing for a client can use pricing inspection findings for buyer's agents.
Is Form 35R the same as a repair addendum?
It does the same job. Other states call it a repair addendum, an amendment or an objection notice. Repair addendum after a home inspection explains the general form, line by line.
Can you terminate after the seller responds?
Yes, on Form 35R Section III, if you reject the seller's response before your reply deadline. Your contract sets that deadline, so confirm it with your agent.
If your Form 35R is due in days and you need a defensible price on every line, upload your inspection report to Kept: $79 per memo, usually under 4 hours.
Sources
Cost figures are modeled from public wage and materials data unless a line says observed. Kept is accountable for the numbers on this page, and corrections go to support@usekept.com. How we price.